ADU foundations and building slabs in Long Beach and Lakewood

A foundation is built to an engineer's plan and passes city inspection before any concrete arrives. We pour from approved plans, coordinate inspections, and leave the slab ready for your framer.

Or call / text (657) 300-7519 with a few photos.

Crew placing concrete over a rebar grid with a pump hose
Crew placing concrete over a rebar grid with a pump hose

Options

What we build

Pick the type that fits your plans. We'll confirm it against your drawings or the site.

Slab on gradeA thickened-edge slab poured in one piece. Common for ADUs and garages on stable soil.
Continuous footing and slabSeparate perimeter footings, then the slab. Used where plans or soil call for deeper footings.
Raised foundationFootings and stem walls for a raised floor. [[CONFIRM: raised foundations offered]]
Shed and equipment slabsSmaller slabs for sheds, AC units and equipment pads. No engineer needed for most.

What's included

What goes into the job

These are the line items you'll see in your written quote. If something doesn't apply to your project, the quote says so.

Plans and permitsWe build from your engineered plans. [[CONFIRM: who pulls the permit]]
LayoutBuilding lines and setbacks marked from the plans; plumbing and electrical sleeves placed before the pour.
ExcavationFootings dug to the depth and width on the plans, with soil report recommendations followed.
ReinforcementRebar per plans, hold-downs and anchor bolts set to layout.
InspectionsFooting and pre-pour inspections scheduled with the city before concrete is ordered.
Vapor barrierUnder-slab vapor retarder where the plans call for it, for living space.
ConcreteMix strength as specified on the plans, often 2,500 to 3,000 PSI minimum.

Projects

Foundations and ADU Slabs: recent work

All projects

[[CONFIRM: these are your own jobs, plus city for each]]

Process

How a foundation job runs

  1. Plan review

    We go over your approved plans, the soil report and site access.

    [[CONFIRM: typical duration]]
  2. Written quote

    Fixed price for the foundation scope with what's excluded spelled out.

    [[CONFIRM: typical duration]]
  3. Excavation and steel

    Layout, footings dug, rebar, hold-downs and sleeves set.

    [[CONFIRM: typical duration]]
  4. Inspection and pour

    City inspection, then the pour with a pump if access needs it.

    [[CONFIRM: typical duration]]
  5. Cure and handoff

    Forms stripped, anchor bolts checked, slab handed to your framer.

    [[CONFIRM: typical duration]]

FAQ

Foundations and ADU Slabs questions

Do I need a permit for an ADU foundation?

Yes. An ADU is a dwelling, so the foundation needs plans and inspections from the city before and during construction.

Do I need a soil report?

Many cities or engineers require one for new living space, especially on expansive clay soils that are common in parts of the area. Your engineer will say what the plans need.

How long does a foundation take to cure before framing?

Framing can often start after several days, but follow your engineer and builder. Concrete reaches its design strength at about 28 days.

Can you pour a slab for a shed or AC unit?

Yes. Small slabs for sheds, AC units and equipment are quick jobs and usually don't need permits. [[CONFIRM: minimum job size]]